Attention!
Driveway Sealing (Updated)

Our driveway resealing schedule:

Start 6/21

East side sealcoat on 6/21 and striping on 6/22

West side sealcoat on 6/23 and striping on 6/24

If you have a car that will be parked in the open lot (not under a building) during this time, please contact Dale Sindt (239 478 0672) as soon as possible. We need to make arrangements to move the vehicle during the sealing process. Dale is prepared to move your car, if requested. If the keys are in your unit, with your permission & the accompaniment of a full-time owner, Dale could retrieve the keys & move your car as needed.

The process will require all vehicles not under a building to be moved to the half of the lot not being sealed that day. Then, the following day they will be moved to the other half so sealing can be completed. The entire process will take 2-4 Days.

Thank you.